摘要
详细介绍了75MW后置机组在启动过程中产生负胀差的处理措施,并通过实际运行数据对该机组产生负胀差的原因做了定性分析。
The measures for the treatment of negative differential expansion occurred during stratup of 75MW post-turbine is presented in details, and an analysis on the reasons for the negative differential expension is made by using the data of actual operation.
出处
《汽轮机技术》
北大核心
2003年第1期54-55,共2页
Turbine Technology