摘要
根据原位和土工实验的结果,推荐了一种新的加固方法——干振碎石桩加普夯法,该法不仅可解决振冲桩施工条件差的问题,还可提高作业效率和质量,而且通过普夯可有效地加速表层冲填土的固结,具有较好的技术经济效果。
Based on the test results in site and laboratory,this paper proposes a new consolidation method,the dry vibroflotation method with uniformly ramming process. Through the compound process theworking efficiency and quality are improved,the consolidation of the surface alluvial soil can be accelerated, and the better economic results can be achieved.
出处
《工业建筑》
CSCD
北大核心
1992年第3期37-40,57,共5页
Industrial Construction