Measurement and Modification of Coupling Situation between SSC RF Cavity and RF Transmitter
-
1Stability Measurement of DC Power Supply for SSC RF Transmitter[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2000(1):87-87.
-
2高永凤,黄森林,王芳,冯立文,庄德浩,林林,朱凤,郝建奎,全胜文,刘克新.Electron bunch train excited higher-order modes in a superconducting RF cavity[J].Chinese Physics C,2017,41(4):164-168.
-
3The Operating Situation of MNSR[J].Annual Report of China Institute of Atomic Energy,1995(0):105-105.
-
4Improvement of Computer Control System for SSC RF Transmitters at HIRFL[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,1999(1):87-87.
-
5杨茂荣,胡克松,李正红,黎明,许州.射频腔光阴极注入器发射度研究[J].强激光与粒子束,2002,14(3):465-468. 被引量:1
-
6LIU Dequan ZHANG Jinhua LIFangzhu YAN Longwen LI Qiang PAN Yudong RAN Hong LI Guangsheng LI Xiaodong.Preliminary Scheme Consideration for Modification of HL-2A Tokamak[J].Southwestern Institute of Physics Annual Report,2005(1):41-42.
-
7YIN Zhi-guo,JI Bin,ZHAO Zhen-lu,LI Zhen-guo,XIA Le,LI Peng-zhan.RF System Stability Issue in CRM Cyclotron[J].Annual Report of China Institute of Atomic Energy,2009(1):38-39.
-
8JIANG Jing LIU Dequan CHENG Fayin RAN Hong.Divertor Modification and Stress Analysis of HL-2A Tokamak[J].Southwestern Institute of Physics Annual Report,2005(1):47-48.
-
9XIA Le, ZHANG Tian-jue, JI Bin, ZHAO Zhen-lu, YIN Zhi-guo.Test and Analysis on Multipactoring Phenomenon in 70 MHz RF System of CRM Cyclotron[J].Annual Report of China Institute of Atomic Energy,2007(1):59-62.
-
10Measuring and Theoretical Analysis of SSC RF Cavity Quality Factor Value[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,1999(1):86-86.