某宾馆结构改造施工技术

Construction Technology of Structure Change in a Hotel
下载PDF
导出
摘要 介绍了某宾馆结构改造涉及到的加固、植筋、扩大截面、承重体系转换、新老混凝土粘结等施工技术,详细论述了大厅部分由原先的砖墙壁承重体系改造为框架结构承重体系所需要的支撑加固、板底加梁、梁扩大截面、由构造柱改造为框架柱、由承重砖墙改造为钢筋混凝土剪力墙等施工技术。 Construction technology of structure reconstruction of a hotel in Nanjing is introduced.The construction technology include reinforcement,embedding bar,adding section of member,conversion technology of bearing system, bonding technology between old and new concrete.Construction technology used in changing the hall from brick bearing system to frame bearing system is expatiated in details,including supporting,adding beam under the slab,scale-up of beam,change from conformation column to frame column,change from brick wall to shearing wall and so on.
作者 陈明雄
出处 《建筑结构》 CSCD 北大核心 2007年第S1期598-600,共3页 Building Structure
关键词 扩大截面法 植筋 加固 结构改造 adding section embed ding reinforcement structure reconstruction
  • 相关文献

二级参考文献2

  • 1刘跃华.砖混结构无支撑托换技术应用[J].建筑技术,2001,(6).
  • 2罗福午.建筑工程质量缺陷事故分析及处理[M].武汉:武汉工业出版社,2000..

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部