摘要 铝水抬包车荷载对电解车间二层操作平台的结构计算影响很大,在我国现行《建筑结构荷载规范》(GB50009—2001)(2006年版)中对铝水抬包车的等效均布活荷载未有明确规定。从结构专业设计的角度,对不同跨度的单向板计算出抬包车车轮荷载的等效荷载,总结出如何合理布置电解车间二层平台的主次梁使结构设计更为经济合理。 The aluminum water ladle trailer load has a great effect on structural design of the second floor operating platform in the potroom. In according with the provisions of Load code for the design of building structures( GB 50009— 2001)( 2006 version),the equivalent uniform live load value of aluminum water ladle trailer is not given definitely. The equivalent uniform live load value of aluminum water ladle trailer for the different spans of one-way reinforced concrete slab is calculated from the perspective of structural design. Make a summing-up that how to dispose the main beams and the secondary beams in the second floor operating platform is proposed in order to make the structural design more economical and reasonable.
作者 邸思鸿
出处 《建筑结构》 CSCD 北大核心 2012年第S2期408-411,共4页 Building Structure
关键词 铝水抬包车 等效均布荷载 楼板跨度 动力系数 aluminum water ladle trailer equivalent uniform live load floor span dynamic factor
  • 相关文献

参考文献2

二级参考文献13

共引文献56

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部