摘要
提供了一种通过RJP工法封底加固替代抽降承压水的新思路及工艺方法。该方法通过RJP满堂加固与工程桩紧密咬合形成整体以解决承压水抗突涌稳定问题,可以减少止水帷幕的插入深度,并避免抽降承压水对环境设施的扰动。该方法在邻近地铁设施的深基坑工程中取得了良好的实践效果。
This paper presents a new method of using RJP-reinforcement instead of confined water dewatering. The method utilizes RJP-reinforcement and structure piles to resist the inrushing of confined water. With this method,the length of curtain for cutting off water can be reduced,and the environment influence of confined water dewatering can be avoided.The method was applied in a deep exaction nearing metro utilities successfully.
出处
《建筑结构》
CSCD
北大核心
2016年第S1期742-745,共4页
Building Structure
基金
上海市科学技术委员会科研计划项目(14231200700)
关键词
RJP工法
深基坑
抽降承压水
RJP
deep excavation
confined water dewatering