小间距平行隧道TBM施工影响分析 被引量:2

Influence analysis on parallel tunnel with small spaced of TBM construction
原文传递
导出
摘要 结合重庆轨道交通环线凤鸣山站-上桥站区间TBM施工隧道工程,采用现场监测与ANSYS有限元数值模拟的计算方法,针对后行隧道施工对先行隧道的受力及其变形的影响进行分析。研究表明,在双线平行隧道施工时,后行隧道施工会对先行隧道造成挤压的作用,导致隧道管片横向变形减小,环向内力改变;并且通过改变双线平行隧道的间距,认为在砂岩(4级围岩)情况下,隧道净间距超过6.6m(1D)时,施工相互影响较弱,可以不进行加固。 Based on the project of two shield tunnels between Fengmingshan station and Shangqiao station of Chongqing rail transit link,monitoring and ANSYS finite element numerical simulation were used to analyze influence of the latter shield tunnel construction on internal force and deformation of the front tunnel. Studies have shown that in parallel tunnel construction the latter tunnel construction may press the front tunnel and cause internal force change of front tunnel; and by changing the parallel tunnel spacing construction interaction is weak when tunnel spacing is greater than 6. 6m(1D) in sandstone(4 grade rock).
出处 《建筑结构》 CSCD 北大核心 2016年第S2期604-608,共5页 Building Structure
关键词 地铁隧道 盾构法 小间距 有限元分析 metro tunnel shield method small spacing finite element analysis
  • 相关文献

参考文献6

二级参考文献35

共引文献207

同被引文献21

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部