期刊文献+

贵州省地质资料馆暨地质博物馆钢结构抗连续倒塌分析 被引量:1

Anti-progressive collapse analysis of Guizhou Geological Archives and Geological Museum
原文传递
导出
摘要 贵州省地质资料馆暨地质博物馆项目—单体1为大跨大悬挑连体高层钢结构建筑,安全等级为一级,应满足抗连续倒塌概念设计的要求。结合本工程整体结构布置,选取5榀大跨连体及大悬挑桁架,以杆件应力为依据从中选取7个关键构件,采用改变传力路径法对结构抗连续倒塌能力进行了分析。结果表明:本工程结构具有较好的整体性及冗余度,能够通过较好的二次传力途径实现抗连续倒塌能力。 The Guizhou Geological Archives And Geological Museum Unit one is a steel frame-epicenter-braced,largespan,large cantilevered connected high-rise steel structure. As the safety level of the project is class one,it is required to satisfy the demands of the conceptual design of the anti-progressive collapse analysis. Baesd on the overall structural arrangement,five large-span connected and large cantilevered truss were chosen,in which 7 key components were selected according to the assessment of the components’ stress value. The alternate path method was used to perform the antiprogressive collapse analysis,and the result suggests the good integrity and redundancy of the structure,in addition,the structure has the ability to resist the progressive collapse through an alternate path.
出处 《建筑结构》 CSCD 北大核心 2018年第S1期284-287,共4页 Building Structure
关键词 抗连续倒塌 改变传力路径法 关键构件 连体结构 大悬挑结构 anti-progressive collapse analysis alternate path method key component connected structure large cantilevered structure
  • 相关文献

参考文献3

二级参考文献11

共引文献37

同被引文献1

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部