1[7]Paolo Leonelli,Sarah Bonvicini,Gigliola Spadoni,New detailed numerical procedures for calculating risk measures in hazardous materials transportation,Journal of Loss Prevention in the Process Industries[J].1999(12),507 ~ 515
2[8]B.Fabiano,F.Curro,E.Palazzi,R.Pastorino,A framework for risk assessment and decision-making strstegies in dangerous good transportation,Journal of Hazardous Materials 93 (2002)1~ 15
3MIAOU S P,CHIN S M.Computing k-shortest path for spent nuclear fuel highway transportation[J].European Journal of Operational Research,1991,53:64-80.
4CHIN S,CHEUNG P.Bicriterion routing scheme for nuclear spent fuel transportation[J].Transportation Research Record,1989,1245:60-64.
5WUZongzhi(吴宗之) DUOYingquan(多英全) LIUMao(刘茂) etal.A study on the methods of risk assessment of hazardous materials during road—transportation[J].应用基础与工程科学学报,2004,12(1):3644-3644.
6REVELLE C,COHON J,SHOBRYS D.Simultaneous siting and routing in the disposal of hazardous wastes[J].Transp Sci,1991,25(2):138-14.
7SUNG K,BELLM GH,SEONGM,PARKS.Shortest pathsin a network with time dependent flow speeds[J].European Journal of Operational Research,2000(121):32-39.
8Center for Chemical Process Safety (CCPS).Guidelincsfor chemical transportation risk analysis[M].New York:AIChE,1995.
9ERKUT E,VERTE V.Modeling of transport risk for hazardous materials[J].Oper Res,1998,46(5):625-642.
10KARA B Y,ERKUT E,VERTER V.Accurate calculation of hazardous materials transport risks[J].Operations Research Letters,2003,31:285-292.