期刊文献+

云绘制环境下实时动态任务调度技术

Research the real time dynamic task scheduling in cloud rendering environment
下载PDF
导出
摘要 现代海洋运输业的发展对船舶海洋运行下三维绘图的数字化建模要求越来越多,同时由于船舶运行环境变化多端、海洋噪声的统计学规律异常复杂,其三维绘图的数据计算量及基于此的绘制渲染控制算法复杂度大大增加,算法效率及绘制时间已经越来越不能满足现代海洋信息化实效的要求。本文对现有的云计算绘制环境进行研究,对海洋环境中的三维绘制数据进行分析提取,提出一种基于云框架的绘图实时动态调度算法,最后进行仿真。 With the development of modern ocean shipping industry,more and more digital modeling of 3D graphics is required. At the same time,due to the operation and running environment of the ship and the complex noise statistical rules,the 3D graphics data calculation and the rendering control algorithm complexity greatly increased,the algorithm efficiency and rendering time is increasingly unable to meet the requirements of modern marine information. This paper research the existing cloud computing architecture,analyze the 3D rendering data in the marine environment, proposed a real time dynamic scheduling algorithm based on cloud framework,finally give the simulation result.
作者 戚龙 赵丹
机构地区 吉林化工学院
出处 《舰船科学技术》 北大核心 2016年第8X期67-69,共3页 Ship Science and Technology
关键词 实时动态任务调度 三维建模 最优组合算法 real time dynamic task scheduling 3D modeling optimal combination algorithm
  • 相关文献

参考文献4

二级参考文献11

  • 1熊正南,蔡开仕,武凤德,高宏伟.21世纪美国战略潜艇导航技术发展综述[J].舰船科学技术,2002,24(3):30-37. 被引量:26
  • 2曹兰英,夏良正,张昆辉.基于小波域MRF模型的SAR图像分割[J].东南大学学报(自然科学版),2004,34(6):847-850. 被引量:7
  • 3HALL N G,SRISKANDARAJAH C. A Survey of machine scheduling problems with blocking and no-wait in process [ J ]. Operations Research, 2005,44 ( 3 ) : 510-525.
  • 4KONAK A, COIT D, SMITH A. Multi-objective optimization using genetic algorithm: a tutorial [ J ]. Reliability Engineering and System Safety,2006,91 (9) :992-1007.
  • 5CARLOS A, GREGORIO T, MAXIMINO S. Handing muhiple objectives with particle swarm optimization [ J ]. IEEE Transactions on Evolutionary Computation, 2004, 8 (3) :256-279.
  • 6SAKAWA M, KUBOTA R. Fuzzy programming for multi- objective job-shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithm[ J ]. European Journal of Operational Research ,2000,12 ( 2 ) :393-407.
  • 7TADAHIKO M, ISHIBUCHI H, HIDEO T. Multi-objective genetic algorithm and its application to flow shop scheduling [ J ]. Computers and Engineering, 1996,30 ( 4 ) : 957 -968.
  • 8ALLAHVERDI A,ALDOWAISAN T. New heuristics form- machine no-wait flow shop to minimize total completion time [ J ]. The International Journal of Management Science, 2004, ( 32 ) : 345 -352.
  • 9KACEM I, HAMMADI S, BORNE P. Pareto-optimality approach for flexible job scheduling problems:hybridization of evolutionary algorithms and fuzzy logic [ J ]. Mathematics and Computers in Simulation ,2002,60( 3-5 ) :245-276.
  • 10何霆,刘飞,马玉林,杨海.车间生产调度问题研究[J].机械工程学报,2000,36(5):97-102. 被引量:105

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部