5Dowsland Kathryn A, Dowsland William B. Packing problems [J]. European Journal of Operational Research, 1992, 56 ( 1 ) :2-14.
6Scheithauer G, Terno J. Modeling of packing problems [ J ]. Optimization, 1993 (8) :63-84.
7Kouvelis P, Wen C Y, Fitzsimmons J. Simulated annealing for machine layout problems in the presence of zoning constraints [ J ]. European Journal of Operational Research, 1992, 57 (2) :203-223.
8Jerry Neve, Philip P Crossland. From push to pull:improving the productivity of an integrated circuit manufacturing line [ J]. National Productivity, 1988,8 ( 1 ) :3543.
9Kuashik Sengupta. A comparison of cells and assembly line layouts for manufacturing a mix of standard and custom products with product lift cycles and product model changes [ D ]. Indiana: Indiana University, 1997.
10Ohta H, Nakamura M. Cell formation with reduction in setup times [ J ]. Computers and Industrial Engineering, 2002,42 (2 - 4) :317-327.