摘要
介绍了潭邵高速公路施工沉降观测的方案布置情况 ,并在对施工中地基沉降特性分析的基础上 ,提出进行地基沉降数据初步分析的方法 ,用于潭邵高速公路路堤施工的动态控制。通过对潭邵高速公路沉降观测数据进行分析 。
This paper describes the scheme arrangement of construction settlement observation of Tan Shao Expressway, and put forwards the methods of preliminary analysis of foundation settlement data for dynamic control of embankment construction of the expressway based on the analysis of foundation settlement characteristics during construction. Through analysis of settlement observation data of Tan Shao Expressway, stabilization and settlement of the foundation under the load of embankment can be understood preliminarily.
出处
《公路》
北大核心
2003年第1期52-56,共5页
Highway
关键词
高速公路
沉降观测
路基
路堤
construction
settlement observation
scheme arrangement