期刊文献+

重庆马桑溪长江大桥合拢方案设计 被引量:6

Closure scheme design of Masangxi Yangtze River Bridge in Chongqing
下载PDF
导出
摘要 马桑溪大桥是一座主跨360m的双塔双索面飘浮体系斜拉桥,主梁为预应力钢筋砼分离式三角箱形梁,主塔为倒Y型,采用挂篮悬浇施工.作为一座长江上的特大桥,边(中)跨能否顺利合拢直接关系到大桥能否按期建成通车,为避免出现意外,设计者对合拢方案做了精心设计,笔者着重介绍合拢方案的设计思路. Masangxi Bridge is a floating cablestayed bridge with doubletower and double cable planes,whose main span is 360m.The main beam is separated triangle beam of prestressed reinforced concrete,and inverted Yshape tower is adopted.As an extralong bridge,the closure of side (center)span touches on the completion and using of bridge in time,and perfect design had been made by designer for preventing contingency.The design idea is introduced in this paper.
作者 喻璐 王翊波
出处 《重庆交通学院学报》 2003年第2期10-14,共5页 Journal of Chongqing Jiaotong University
关键词 重庆马桑溪长江大桥 合扰方案 斜拉桥 桥梁设计 施工方法 Masangxi Yangtze River Bridge cable-stayed bridge closure
  • 相关文献

参考文献3

  • 1林元培.斜拉桥[M].北京:人民交通出版社,1997..
  • 2严国敏.现代斜拉桥[M].成都:西南交通大学出版社,1997..
  • 3四川省交通厅公路规划勘察设计研究院.涪陵长江大桥施工图.(第二册,上部结构)[S].成都,1995..

共引文献56

同被引文献37

引证文献6

二级引证文献44

相关作者