摘要 崖门大桥主桥为(50+115+338+115+50)m双塔单索面预应力混凝土斜拉桥,采用墩、塔、梁固结的结构体系,主跨338m,设计新颖,在施工中大量使用了新工艺、新技术。介绍其基础施工、上部结构施工方案、施工步骤以及主要施工技术特点和技术难点。 The main spans of Yamen Bridge are designed as a prestressed concrete cablestayed bridge of twin pylons and single cable plane with the spans arranged as (50+115+338+115+50) m and with their piers, pylons and girder rigidly connected. The bridge is unique in design and is notable for quite a few new workmanship and new techniques used in the construction. In this paper, the foundation construction, superstructure construction schemes and procedures and the principal construction technique features and difficulties of the bridge are expounded.
出处 《桥梁建设》 EI CSCD 北大核心 2003年第1期9-11,共3页 Bridge Construction
关键词 崖门大桥 主桥 斜拉桥 桥梁架设 施工方法 施工技术 cable-stayed bridge bridge construction bridge erection construction method
  • 相关文献

同被引文献3

  • 1JTJ041-2000.公路桥涵施工技术规范[S].[S].,..
  • 2JTGD62-2004.公路钢筋混凝土及预应力混凝土桥涵设计规范[S].[S].,..
  • 3Tomoki Nakamura, Kazutem Tsuchida, Hiroshi Ohno, Naoki Nagamoto. Bai Chay Bridge, Vietnam[ J]. Structural Engineering International, 2007,17 (3) :210 - 213.

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部