摘要
通过分析工程更改的业务流程,总结出其工作特点,提出工程更改采用基于MBOM的分布管理模式。
Through analyzing the business process of Engineering Change, we summarize its specialty, and put forward a new management model of Engineering Change, which is based on MBOM within the distributed environment.
出处
《计算机应用与软件》
CSCD
北大核心
2003年第3期26-27,共2页
Computer Applications and Software