期刊文献+

立井混合临时改绞安装施工 被引量:3

A Temporary Change Installation Construction in Mixing Vertical Shaft
下载PDF
导出
摘要 立井混合临时改绞是将立井井内原来的吊桶提升改为罐笼和箕斗混合提升。是为了在主副井井筒永久设备没有形成前,利用风井混合临时提升设备,提高提升能力及提升量。混合井立井布置尤为复杂,罐笼和箕斗布置在一个立井混合提升兼顾人员物料上下,对设计和安装布置提出了重要要求。 Vertical mixing temporary reequipping is the original Takai Iuchi bucket hoist is changed into a cage and skip mixed hoisting.In order to in the main auxiliary shaft without permanent equipment before the formation of air shaft ,using mixed temporary lifting equipment ,enhance capability and im-prove quality.Mixed well shaft arrangement is particularly complex ,cage and skip arranged in a well-bore mixed hoisting both personnel material ,put forward an important requirements for the design and installation.
出处 《建井技术》 2014年第S1期119-122,96,共5页 Mine Construction Technology
关键词 立井混合 临时改绞 施工准备 安装施工 vertical shaft mixing temporary change construction preparation installation construction
  • 相关文献

参考文献1

共引文献8

同被引文献9

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部