摘要
以清远市大燕河大连围大燕河干堤为例,利用Autobank软件,选取不同工况,对堤防加固前、后的渗流进行计算,其成果可对同类工程防渗加固设计提供参考。
Taking Dayan River Dalian Wai Dayan River Main Embankment in Qingyuan City as an example,this article calculates the seepage before and after levee reinforcement in different working conditions by using Autobank.The results can provide reference for seepage control and reinforcement design of similar projects.
出处
《吉林水利》
2019年第7期16-21,共6页
Jilin Water Resources