1OREN S S,SPILLER P T,VARAIYA P et al.Nodal Prices and Transmission Rights:A Critical Appraisal.The Electricity Journal,1995,9(2):24-35.
2USA Department of Energy.National Transmission Grid Study (Mimeo,2002).http://certs.lbl.gov/.
3CONTRERAS J,GROSS G.Transmission Investment in Competitive Electricity Market.In:Proceedings of Bulk Power System Dynamics and Control Ⅳ.Cortina d' Ampezzo (Italy):2004.
4ANDERSON K P,MCCARTHY A.Transmission Pricing and Expansion Methodology:Lessons from Argentina.Utilities Policy,1999,8(4):199-211.
5NADIRA R,AUSTRIA R R,DORTOLINA C A et al.Transmission Planning Today:A Challenging Undertaken.The Electricity Journal,2004,17(4):25-32.
6CHAO X Y,FENG X M,SLUMP D J.Impact of Deregulation on Power Delivery Planning.In:Proceedings of 1999 IEEE Power Engineering Society Transmission and Distribution Conference,Vol 1.New Orleans (LA,USA):1999.340-344.
7RUDNICK H,QUINTEROS R.Power System Planning in the South America Electric Market Restructuring.In:Proceedings of VI Symposium of Specialists in Electric Operational and Expansion Planning (SEPOPE).Salvador (Brazil):1998.
8RUDNICK H.Generation and Transmission in Developing Countries:Planning in a Deregulated Environment in Developing Countries:Bolivia,Chile and Peru.IEEE Power Engineering Review,1996,16(7):18-22.
9WONG H,CHAO H,JULIAN D et al.Transmission Planning in a Deregulated Environment.In:Proceedings of 1999 IEEE Power Engineering Society Transmission and Distribution Conference,Vol 1.New Orleans (LA,USA):1999.350-355.
10HIRST E,KIRBY B.National Transmission Grid Study Issue Papers-Transmission Planning and the Need for New Capacity (Mimeo,2002).http://certs.lbl.gov/.