2Lee S, Kim K, Yu J. BIM and ontology-based approach for building cost estimation[J]. Automation in Constrton, 2014, 41 (10): 96-105.
3Monteiro A, Pocts Martins J. A survey on modeling guidelines for quantity takeoff-oriented BIM-based design[J]. Automation in Construction, 2013, 35 (10).
4Becerik-Gerber B, Jazizadeh F, Li N, etal. Application areas and data requirements for BIM-enabled facilities nmnagement[J]. Journal of Construction Engineering and Management-Asce, 2012, 138 (3).
5Kamn E P, Irizarry J. Developing a spatial data framework for facility management supply chains[C]. Atlanta, GA, United states: American Society of Civil Engineers (ASCE), 2014.
6Cheung F K T, Rihan J, Tah J, et al. Early stage multi-level cost estimation for schematic BIM model[J]. Automation in Construction, 2012, 27 (5) : 67-77.
7Kim H, Anderson K, Lee S, et al. Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology[J]. Automation in Construction. 2013, 35 (11) : 285-295.