期刊文献+

股道全顶式调速系统编组场纵断面测量问题的思考

Considerations About the problems of Railway Track Retarders Speed Control System Marshalling Yards
下载PDF
导出
摘要 本文介绍了编组站纵断面测量问题的基本概况,分析了格尔木站编组场纵断面存在的问题,重新测量了该站纵断面,采用股道全顶式调速系统进行更新设计,完成了测量数据整理、设备数量计算和模拟验算等方面工作,并对编组场纵断面测量问题进行了思考。 This paper analyzes the basic condition of surveying of longitudinal profile of marshalling yards.It analyses the existing problems of Golmud marshalling yard profile.The authors measure surveying of longitudinal profile and renovate the design by using railway track retarders speed control system. This paper summarizes measurement data, calculates the amount of devices, simulates calculation. In the end,it discusses the prospect of the surveying of longitudinal profile of marshalling yards.
出处 《减速顶与调速技术》 2017年第4期6-8,共3页 Retarders & Speed Control Technology
关键词 格尔木站 调速系统 纵断面测量 设计 模拟验算 Golmud railway station speed control system surveying of longitudinal profile design simulative calculation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部