该工程位于沭阳,该区域大多数工程采用预制桩,其造价高,工期长。而本方案因地制宜采用CFG桩进行地基处理,使地基承载力满足要求,沉降小。取得了较好的经济性。该方法可为类似的地质情况提供较好的参考性。
The project is located in Shuyang area, and the majority of the engineering projects in the region are made of prefabricated piles, which are of high cost and long construction period. In the light of local conditions, the CFG pile is used in the foundation treatment, the bearing capacity of the foundation can meet the requirements, and the settlement is small, it achieved better economic result. This method can provide good reference for similar geological conditions.