摘要
混凝土算量是施工现场一项至关重要的工作,其精准度直接影响到现场浇筑混凝土的工作效率和成本控制。传统混凝土算量工作繁琐且无法保证计算精度。通过利用BIM技术辅助进行混凝土算量工作,有效提取BIM模型中的工程量信息,为混凝土算量提供了新的工作模式,一定程度上控制了人力和资源的浪费。
Calculation of concrete quantity is a very important work in construction project, because accurate calculation would directly influence the pouring efficiency and cost control of cast-inplace concrete. Conventional calculation of concrete quantity is complex and could not guarantee the calculation accuracy. Application of BIM technique in calculation of concrete quantity could effectively collect information about engineering quantity from the BIM model, providing a new working mode for calculation of concrete quantity and realizing control of labor and resource waste on certain degree.
出处
《建筑技术》
北大核心
2015年第2期129-131,共3页
Architecture Technology