超高层核心筒液压爬模施工技术 被引量:13

CONSTRUCTION TECHNIQUE OF HYDRAULIC CLIMBING FORMWORK FOR SUPER-HIGH CORE TUBE
下载PDF
导出
摘要 北京绿地中心超高层工程在核心筒结构施工中采用液压爬模体系,保证了核心筒墙体结构安全。同时,施工中针对水平构件钢筋连接做法、墙体变截面、桁架层托座、塔式起重机爬升等施工难点提前制订了一系列措施,特别针对高空消防安全采取了预控措施,取得了良好的效果。 Hydraulic climbing formwork was used for construction of core tube structure in the super-high Beijing Greenland Center project, to guarantee the structural safety of core tube wall. Meanwhile, a series of measures were prepared in advance against construction difficulties, such as connection of steel bars in horizontal component, variable cross-section of wall, base of truss layer and climbing of tower crane, etc., and advance control of fire and safety at high altitude were also adopted. These measures realized favorable construction effects.
出处 《建筑技术》 北大核心 2015年第2期146-148,共3页 Architecture Technology
关键词 超高层 核心筒 液压爬模 消防安全 super-high building core tube hydraulic climbing formwork fire protection
  • 相关文献

参考文献1

二级参考文献6

共引文献8

同被引文献38

引证文献13

二级引证文献51

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部