摘要
针对政府投资建设项目管理特点,以某工程为案例,总结出施工索赔管理风险分析、索赔取证和费用计算等具体方法,体现发承包双方公平公正、双赢互利的合同管理原则,对指导类似项目的施工索赔管理具有一定的借鉴意义。
In the government investment construction project management features, with an engineering case, summarizes the risk analysis, the claimevidence and cost calculation method, fully embodies the contracting parties to justice, mutually beneficial win-win contract management principles, has certain reference meanings to the con-struction claim management guide the similar project.