摘要
按照设计和基础施工要求,控制钻孔灌注桩的质量,是建筑施工中的一个重要问题。以某建设工程采用S.M.无土泥浆技术的成孔试验施工为例,研究钻孔工艺调整、钻孔进程、S.M.无土泥浆循环等项目管理问题,分析该试验施工中的经验和教训,为S.M.无土泥浆成孔技术在今后的工程项目钻孔灌注桩施工的试验应用提出建议和展望。
In accordance with the requirements of desingn and construction, quality control of bored pile is an important problem in building construction. With a case of building into the hole test project applied soilless mud SM technology, analyzed project management problems, such as how to adjust the drilling crafts, drilling processes, SM soilless mud circulation, studied the test experience and lessons, put forward suggestions and prospects to popularize SM soilless mud into the hole technology in China.
出处
《建筑经济》
北大核心
2014年第6期42-45,共4页
Construction Economy