摘要 垂直防渗帷幕在城市垃圾填埋场的应用日趋广泛。针对盐城市某固体垃圾填埋场的工程地质条件,设计了相应有效的垂直防渗帷幕工程。根据项目实际工程情况,对若干垂直防渗帷幕技术方案进行比较,选择项目最优技术方案。针对垂直防渗帷幕施工期和库区堆载期的工程稳定性,用FLAC^(3D)模拟计算软件进行相应的计算,对工程施工和后期堆载提供了一定的参考和指导。 Vertical anti-seepage curtain is widely used in municipal landfill.In allusion to the engineering geological condition of landfill site in Yancheng,designed an effective vertical antiseepage curtain project.According to the actual project of the project,compare a number of Vertical anti-seepage curtain technical schemes,select the best technical solution for the project.Aim at Vertical anti-seepage curtain construction period and the engineering stability of the storage period in the reservoir area,used FLAC3 Dto calculate,provided some references and guidance for the construction and post-stacking.
出处 《给水排水》 CSCD 北大核心 2018年第S2期103-107,共5页 Water & Wastewater Engineering
关键词 垃圾填埋场 垂直防渗帷幕 FLAC3D 工程稳定性 Landfill site Vertical anti-seepage curtain FLAC^(3D) Engineering stability
  • 相关文献

参考文献6

二级参考文献62

共引文献106

同被引文献21

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部