某项目末端试水装置存在问题剖析

Analysis of the problems in the terminal water testing device of a project
下载PDF
导出
摘要 结合现行有关国家及行业标准规范的规定,就某已建多层办公建筑自动喷水灭火系统末端试水装置存在的问题,分别从热浸镀锌钢管的螺纹连接、压力表的选用及安装、配套排水设施的安装以及管道固定四个方面,对其进行分析,并就有关问题做了进一步剖析。 Based on the current national and industry standards and regulations, this paper analyses the problems existing in the terminal water testing device of the sprinkler system of a multi-storey office building, including the threaded connection of hot-dip galvanized steel pipes, the selection and installation of pressure gauges, the installation of auxiliary drainage facilities and the fixing of pipes, and further analyses the related problems.
作者 崔景立 张军 刘建锋 卫海凤 周军榕 Cui Jingli;Zhang Jun;Liu Jianfeng;Wei Haifeng;Zhou Junrong(SIPPR Engineering Group Co.,Ltd.,Zhengzhou 450007,China;China Northwest Architectural Design and Research Institute Co.,Ltd.,Xi'an 710018,China;Jinhua Polytechnic,Jinhua 321007,China)
出处 《给水排水》 CSCD 北大核心 2019年第3期106-108,共3页 Water & Wastewater Engineering
关键词 末端试水装置 螺纹连接 压力表 精确度 管道支架 Terminal water testing device Threaded connection Pressure gauge Accuracy Pipeline bracket

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部