摘要
以招商银行深圳分行大厦项目为依托,介绍结构梁与支撑梁、柱墙与支撑梁、地下室外墙与支撑梁以及支撑梁与人防结构等部位相冲突时的处理措施,该施工技术不仅保证了地下室基坑和地铁的安全,又确保了地下室施工进度.为同类工程施工提供了宝贵的经验。
Based on the China Merchants Bank Shenzhen Branch Building project,treatment measures are introduced for confli between structural beam and supporting beam,column wall and supporting beam,exterior basement wall and supporti beam,supporting beam and aerial defense structure,etc.The construction technique not only guarantees the safety basement foundation pit and subway,but also ensures the construction schedule of basement,providing precio experiences for similar projects.
出处
《建筑技术开发》
2014年第10期9-12,共4页
Building Technology Development
关键词
支撑梁
后拆法
地铁施工
基坑支护
supporting beam
post-dismantlement method
subway construction
support and protection of foundation pit