铁路站场的改造是一项复杂的工作,不仅涵盖专业多,而且需要较强技术及安全意识。同时在改造期间,须保证行车的安全性及运输的畅通性。在这样的工作要求下,相关工作者一定要创建出完善的施工计划及过渡方案。文章以塘沽站为例,具体讨论改造施工和过渡方案在铁路站场的优化方面的问题。
The reconstruction of railway station is a complex work,it not only covers many professional,but also requires strong technical and safety awareness.At the same time during the transformation,we must ensure that the safety of traffic and transport smooth.Therefore,in such a job requirements,the relevant workers must create a sound construction plan and the transition program.Then the following we Tanggu station,for example,to discuss concrete construction and transition program in the railway station optimization problems.
出处
《建筑技术开发》
2017年第2X期75-77,共3页
Building Technology Development
关键词
铁路站场
改造施工
过渡方案
railway station yard
reconstruction construction
transition scheme