摘要
长春恒大城二期建设及配套工程采用结合BIM技术与ERP系统研发适合于中小型项目部的管理模式,按5W1H原则制订详细对策,强化安全质量与资源管理,使用网络规划模型进行施工进度优化,综合控制效果良好。
Construction and supporting projects of Changchun Evergrande City Phase II were based on BIM technique and ERP system to research and develop a management mode applicable to medium and small project department Detailed countermeasures were established according to 5W1 H principle,with the purpose to enhance safety quality and resource management.Network planning model was used for optimization of construction schedule,and favorable general control effects were realized.
出处
《建筑技术开发》
2017年第3X期5-7,共3页
Building Technology Development