摘要
中海油能源技术开发研究院建设项目交叉作业多,各专业之间的协调难度大,体量大,节能设计要求高,工程创优目标高,机电管线复杂,对机电安装和管线综合要求高。通过全过程精细化管理,保证了工程技术、质量、安全、工期等各项目管理目标的实现,高效保质地完成工程建设。
CNOOC Energy Technology Development Institute project involved complex crossed tasks,huge difficulties in coordination among different disciplines,big structural volume,high design requirement for energy conservation,high excellence creation target and complex electromechanical pipelines,which have high general requirements for electromechanical installation and pipeline construction.Whole process refined management was adopted to successfully guarantee engineering technology,quality,safety,construction schedule and realization of various project management targets.The engineering construction was effectively completed with high quality.
出处
《建筑技术开发》
2017年第5X期20-23,共4页
Building Technology Development
关键词
机电管理
全过程管理
绿色施工
electromechanical management
whole process management
green construction