摘要
对原顺德第一人民医院进行改造,不改变原有的各系统设计,根据最新规范和建筑调整对改造区域内相关给排水及消防系统末端进行优化调整,包括给水系统、排水系统、卫生措施、消火栓系统等,并对设计的重难点部分给出分析及建议。
This design is a reconstruction project,which does not change the original design of the system. According to the latest specifications and building adjustments,the end of the relevant water supply and drainage and fire protection systems in the renovation area are optimized,including water supply system,drainage system,sanitary measures,fire hydrant system,etc.. The paper also gives some analysis and suggestions on the heavy difficulty part of the design.
作者
钟可华
Zhong Kehua(Guangdong Provincial Institute of Architectural Design,Guangzhou 510010,China)
出处
《山西建筑》
2019年第10期124-125,共2页
Shanxi Architecture
关键词
给水排水
修缮工程
消防系统
water supply and drainage
repair works
fire fighting system