摘要 针对水电系统长期耗能最小问题设计了求解方法:首先定义一个搜索方向集,然后按等微增率原理,依次按对目标有利程度的大小顺序选择搜索方向逐时段进行系统负荷平衡。通过对福建水电站系统的应用,证明长期耗能最小发电调度模型及其求解方法具有耗时较少、能有效减少弃水等优点。 In the hydropower systems the problem of energy consumption minimization can be simply expressed as follows: given a load demand process, schedule the generation of hydroplants such that the potential energy at the endofstudy is maximal. To solve this problem, this paper designs a procedure, in which a set of search directions is firstly defined, and then based on the principle of reaching equal incremental, one of the defined directions is selected at a time, in order to improve the objective, under condition to meet the power demand stage by stage. With application to Fujian hydroplant systems, the model of energy consumption minimization and its solving method are practically tested efficiently.
出处 《水电能源科学》 2003年第1期42-45,共4页 Water Resources and Power
关键词 大规模水电系统 长期优化调度 耗能最小 等微增率 子模型重构 large-scale hydropower systems long-term optimal dispatching energy consumption minimization equal incremental sub-model re-construction
  • 相关文献

参考文献3

二级参考文献2

  • 1中华人民共和国水利部.中国98大洪水[M].北京:中国水利电力出版社,1993.
  • 2国家质量技术监督局.大中型水电站水库调度规范[M].北京:中国标准出版社,1993.

共引文献84

同被引文献75

  • 1张春发,赵宁,王惠杰,李利平.大型电站负荷优化分配研究[J].发电设备,2004,18(S1):73-77. 被引量:4
  • 2韩桂芳,陈启华,张仁贡.动态规划法在水电站厂内经济运行中的应用[J].水电能源科学,2005,23(1):48-51. 被引量:34
  • 3Labadie J W. Optimal Operation of Multireservoir Systems: State-of-the-art Review [J]. Journal of Water resources Planning and Management, ASCE, 2004, 130(2): 93-111
  • 4Halim A, Rashid A, Nor K M. An Efficient Method for Optimal Scheduling of Fixed Head Hydro and Thermal Plants[J]. IEEE Trans on Power Systems, 1991, 6(2): 632-636
  • 5Yu Z, Sparrow F T, Nderitu D. Long-term Hydrothermal Scheduling Using Composite Thermal and Composite Hydro Representation [J]. IEE Proc- Gener Transm Distrib, 1998, 145(2): 210-216
  • 6Sherkat V R, Moslehi K, Sanehez G, et al. Modular and Flexible Software for Medium- and Shortterm Hydro-thermal Scheduling [J]. IEEE Trans on Power Systems, 1988, 3(2)~ 1 390-139 6
  • 7Ponnambalam K, Quintana V H, Vannelli A . A Fast Algorithm for Power System Optimization Problem Using Interior Point Method [J]. IEEE Trans on Power Systems, 1992, 7(2) : 892-898
  • 8Tong S K, Shahidehpour S M. An Innovative Approach to Generation Scheduling in Large-scale Hydro-thermal Power Systems with Fuel Constrained Units[J]. IEEE Trans on Power Systems, 1990, 5(2): 665-673
  • 9El-Hawary M E, Ravindranath K M. Hydro-thermal Power Flow Scheduling Accounting for Head Variation[J]. IEEE Trans on Power Systems, 1993,7(3): 1 232-1 238
  • 10Shawwash Z K, Siu T K, Denis S O. The B.C. Hydro Short-term Hydro Scheduling Optimization Model [J]. IEEE Trans on Power Systems, 2000, 15(3): 1 125-1 131