摘要
通过对不同埋设方法,埋设在不同材质中的沉降测量基准点,组成一个沉降高程控制试验网,对沉降测量基准点的位移作了分析,对建筑物沉降观测中提出了基准点的埋设方法及注意事项。
This paper analyzed the displacement of reference point in setdement surveying, through an setdement height control test network, which is composed of reference points of setdement surveying by different burying way and burying in diflferent material, and the burying way and notice of reference point is put forward during the setdement surveying of building.
出处
《江苏测绘》
2002年第4期23-24,共2页
Jiangsu Surveying and Mapping