摘要
为适应隔河岩坝址特殊的自然条件,采用拱梁分载法进行平、斜封拱坝的比较计算,并对各种斜封拱坝方案进行分析研究,结合三维有限元计算及结构模型试验验证,选用三心单曲、上重下斜封拱式重力拱坝体型.安全监测资料表明:大坝受力条件优越,运动正常.
In consideration of the natural condition at the Geheyan dam site, the arch cantilever loaddistribution method was applied to comparison of the flat arch dam with the oblique arch dam, and various schemes of oblique arch dam were studied. In combination with 3D FEM computation and structural model tests, a threecenter singlecurvature and upper gravity lower oblique arch dam was finally determined. It has been in normal operation for 8 years since it begun to retain water in April 1994. Safety monitoring data show that the stressing condition of the dam is favorable, testifying its successful design.
出处
《河海大学学报(自然科学版)》
CAS
CSCD
北大核心
2003年第2期166-170,共5页
Journal of Hohai University(Natural Sciences)
关键词
隔河岩
重力拱坝
拱梁分载法
设计
Geheyan
arch gravity dam
arch cantilever load-distribution method
design