东壁岛围垦对元洪港区潮流及泥沙淤积影响的数值模拟 被引量:4

Numerical simulation of influence of Dongbi Island reclamation project on tidal current and sediment deposition in Yuanhong Port area
下载PDF
导出
摘要 利用所建立的具有动边界的福清湾潮流数学模型,研究了东壁岛围垦前后元洪码头前的潮量及流速变化,并采用工程泥沙方法估算了元洪码头前的泥沙淤积强度.研究表明,在元洪码头前250m范围以内,围垦后的流速较围垦前略有减小,围垦所引起的泥沙淤积强度为0 05m/a. A tidal current numerical model with floodebb land boundary was developed for the Fuqing Bay for research of the influence of reclamation. The reclamationinduced variation of the tidal capacity and flow velocity in front of the Yuanhong Dock was calculated based on the engineering sedimentation method. The results show that in the range of 250?m ahead of the Yuanhong Port, the flow velocity decreases a little after the completion of the reclamation project, and the project inducedsiltation intensity is 0.05?m/a, indicating that the influence of the reclamation project on the tidal current and the sediment deposition in the Yuanhong Port area is small.
出处 《河海大学学报(自然科学版)》 CAS CSCD 北大核心 2003年第2期220-223,共4页 Journal of Hohai University(Natural Sciences)
关键词 泥沙淤积 福清弯 围垦工程 潮流 数学模型 Fuqing Bay reclamation project tidal current numerical model siltation analysis
  • 相关文献

参考文献2

  • 1刘家驹.连云港外航道的回淤计算及预报[J].水利水运科学研究,1980,(4):31-42.
  • 2王震 谭亚 丁坚.淤泥质海湾潮流输沙数学模型[A]..第八届全国海岸工程学术讨论会暨1997年海峡两岸港口及海岸开发研讨会论文集[C].北京:海洋出版社,1997.439-444.

共引文献12

同被引文献37

引证文献4

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部