关于预应力高强混凝土管桩的桩体上浮问题 被引量:14

THE PROBLEM OF PILE SHAFT FLOATING UP FOR PHC TUBULAR PILE
下载PDF
导出
摘要 预应力高强混凝土 (PHC)管桩作为一种新桩型 ,近年来在沿海软土地区得到了广泛的应用 ,初期用于多层建筑 ,逐渐发展到小高层乃至高层建筑。在快速推广的过程中 ,发现了PHC管桩在设计、施工中的一些问题 ,其中最主要的是桩体上浮问题。通过对几个工程实例的分析 ,对桩体上浮原因进行了讨论 。 As a new type of pile,the pre stressed tubular pile with high strength concrete (PHC) is getting widely used in many soft soil areas around the coastal region.At the beginning,it was only used on multi rise buliding.then,rapidly on high rise building,In this disseminating process,some problems related to design and construction of PHC tubular pile are discovered,in which,one of the main problem is the floating up of pile shaft.Based on the analysis of several engineering cases,the causes of pile floating up are discussed.
作者 马时冬
机构地区 华侨大学土木系
出处 《工业建筑》 CSCD 北大核心 2003年第3期78-80,共3页 Industrial Construction
关键词 预应力 高强混凝土 管桩 HPC管桩 桩身上浮 挤土效应 超孔隙水压力 PHC tubular pile\ pile shaft floating up\ effect of soil displacement\ excess pore water pressure
  • 相关文献

同被引文献52

引证文献14

二级引证文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部