三峡工程夏季混凝土浇筑温控措施 被引量:1

Concrete pouring and temperature controlling measures for Three Gorges Project in the summer
下载PDF
导出
摘要 三峡工程是目前世界上最大的水利水电工程,混凝土浇筑总量约2800万m3,第二阶段工程混凝土量约1200万m3。针对夏季混凝土温控工作,在生产、运输和浇筑过程中,采取了先进的两次风冷骨料、加冰片及冷水拌和工艺;在拌和楼前道路两侧设置喷雾装置;混凝土运输车设遮阳篷;仓面覆盖;仓面喷雾等。通过这些措施,有效地降低了混凝土的出机口温度、入仓温度和浇筑温度,有利于确保混凝土浇筑质量。 The Three Gorges Project is the biggest hydroengineering project in the world at present. The total concrete pouring volume is about 28 million m3,and its secondstage concrete pouring volume is about 12 million m3. In the course of concrete producing, carrying and pouring, some measures are adopted to control concrete temperature, such as twice windcooling aggregate, adding ice sheet and cooling water in concrete mixing. And the following measures are adopted, that is, the sprinkling machine on the two sides of the mixing plant road, the sunlight shielding over the mixing plant road, the sunlight shielding over the concrete carrying trucks, the working area covering, the working area sprinkling, and so on. Through these measures, the concrete mixermouth temperature, concrete placing temperature and concrete pouring temperature are decreased effectively. The quality of concrete pouring is assured.
作者 叶国强
出处 《水力发电》 北大核心 2003年第3期20-21,共2页 Water Power
关键词 混凝土温度控制 混凝土冷却 入仓温度 喷雾装置 三峡工程 Concrete temperature controlling, concrete cooling, placing temperature, sprinkling machine, Three Gorges Project
  • 相关文献

参考文献1

  • 1中国水利水电科学研究院结构材料研究所.大体积混凝土[M].北京:中国水利水电出版社,1990..

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部