摘要
通过转化吸收从瑞士ABB公司引进的技术,进行认真的技术准备和工艺攻关,最终完成了水内冷绕组的水接头样品试制,达到了ABB公司质量标准。
Having carried on earnest technique preparation and technology research by the advanced technique transformed and absorbed from ABB corporation,Switzerland,the specimen of the watercooled coil joints has been completed finally,which was in accordance with the quality standard of ABB corporation.
出处
《大电机技术》
北大核心
2003年第2期28-30,34,共4页
Large Electric Machine and Hydraulic Turbine
关键词
水轮发电机
空心导线
水冷绕组
hydrogenerator
hollow conductor
water-cooled coil