建设项目动态风险分析方法研究 被引量:19

STUDY ON DYNAMIC RISK ANALYSIS MET HOD IN CONSTRUCTION PROJECT
下载PDF
导出
摘要 在建设项目管理中风险分析的重要性是不言而喻的,国内外许多的专家学者对此都作过深入的研究,并提出很多风险分析方法。然而,由于建设项目本身的复杂性、外界环境的多变性以及建设周期长等特点,致使各风险因素的变化随时间波动较大,大部分的风险分析方法虽对这一问题有所涉及,但最终解决方法仍不十分理想。本文在前人研究成果的基础上,以研究风险因素变化的时间性入手,从建设项目分阶段的角度提出一种风险的动态分析方法。此方法包括动态风险因素的识别和监控,并以风险期望损失发生后的最终体现——项目收益的减少为风险研究对象。 In construction project management, the importance of risk analysis is obvious. There are many experts and researchers at home and abroad who have studied it deeply, and they present a lot of risk analysis methods. However, due to the complication of project - self, the diversity of external environment, and the long period of construction, the change of risk factors fluctuates greatly with the time. Also, most methods relate to this aspect, but not deeply. This paper emphasizes the timeliness of risk factor changes, and presents a new method of risk dynamic analysis from the angle of the stage of construction project. This method includes the risk factors of dynamic identification and control, and studies the reduction of projected profits as influenced by risk expected losses.
出处 《土木工程学报》 EI CSCD 北大核心 2003年第3期41-45,共5页 China Civil Engineering Journal
关键词 建设项目 项目管理 风险分析 动态分析 construction project, project management, risk analysis, dynamic analysis
  • 相关文献

参考文献7

  • 1Project Management Institute A Guide to the Project Management Body of Knowledge PMI, Inc. 2000
  • 2A. Uchechukwu Elinwa and Silas A. Buba. Construction Cost Factors in Nigeria. Journal of construction engineering and Management, Vol. 119 No. 4, 1993, pp698~713
  • 3L Y Shen. Project risk management in Hong Kong. International. Journal of Project management, Vol. 15No. 2, 1997, pp 101 ~ 105
  • 4Daniel W M Chan and Mohan M Kumaraswamy. A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project management, Vol. 15 No. 1, 1997, pp55~63
  • 5Chalabi F A and Camp D. Causes of delays and overruns of construction projects in developing countries. Proeeedings of the CIB, W65 Vol. 3, 1984, pp723~734
  • 6C. Arthur Williams Jr., Michael L. Smith and Peter C.Young. Risk Management and Insurance. McGraw-Hill, Inc.1995
  • 7邱广振,徐术陇.工程项目风险控制动态分析[J].沈阳建筑工程学院学报,1998,14(2):114-117. 被引量:18

共引文献17

同被引文献144

引证文献19

二级引证文献88

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部