结合神延铁路秃尾河特大桥利用移动支架式造桥机建造 3 2 /64mPC箱形简支梁的施工实例 ,介绍了利用移动支架式造桥机制梁的施工方法 。
Taking the Tuwei river bridge in Shenyan railway as example the construction method utilizing mobile frame type bridge assembling machine to build 32/64 meter PC box girder is introduced. This method successfully finished the bridge construction which has the largest span in similar bridges.