摘要
以某净水车间为例 ,介绍了大跨度网架整体吊装的施工工艺 ,对所选的地面拼装、拔杆整体吊装方案进行了详尽阐述 ,成功地完成了面积大。
Taking one water purification plant as example the integral hoisting construction technology of large span space frame is introduced. And for ground consolidation and the integral hoisting plan of rocker some detailed discussions are carried out to ensure the completion of integral hoisting construction of large space frame.
出处
《山西建筑》
2003年第3期93-94,共2页
Shanxi Architecture
关键词
网架
吊装
拔杆
同步控制
space frame, hoisting, rocker, synchro control