介绍了秦沈客运专线路基的施工过程 ,从基底处理、分层填筑、摊铺、晾晒、碾压整实等方面进行了详细的阐述 ,经检验各项指标均达到设计要求 。
The subgrade construction process of Qinhuangdao Shenyang special railway line for passenger transportatio is introduced. Some detail elaborations are carried out for base treatment, spreading, rolling, and so on. At last the checking shows that all indexes meet the design requirements and good economic benefits are acquired.
出处
《山西建筑》
2003年第3期257-258,共2页
Shanxi Architecture
关键词
路堤
基底
填筑
摊铺
subgrade, base, fill, spreading