以工程现场试验为例 ,通过对填石路堤压实厚度、填料最大粒径 ,压实机械及压实遍数等影响压实效果的因素的综合分析 。
Taking field experiment as example and based upon analysis of compactness of rock fill subgrade, the maximum particle size of fillers, compacting machine and compaction times the factors influencing the compactness are comprehensively analyzed. And a control criterion is build to evaluate the compactness under the overweight condition.
出处
《山西建筑》
2003年第3期259-260,共2页
Shanxi Architecture
关键词
填石路基
压实度
质量控制
碾压
rock fill subgrade, compactness, quality control, rolling