期刊文献+

管道焊接缺陷合于使用评定技术进展 被引量:7

The Development of Fitness for Service Assessment Standards for Pipeline welding Defects
下载PDF
导出
摘要 为保证大型结构及长距离油气输送管线的结构完整性 ,有关国家先后制定了以“合于使用”为原则的缺陷评定标准 ,在管道建设中发挥了巨大作用。重点讨论了 R6、API5 79、BS791 0和 SINTAP评定技术的最新发展与相互联系 ,为我国管道评定技术研究提供参考。 It's a focus of the world to assess the structure integrity of large metal structures and long distance oil and natural gas pipelines.Many flaw assessment standards based on Fitness-for-Purpose procedure have been developed.Here we discussed the newly development and relations of several flaw assessment methods such as R6,API 579,BS 7910 and SINTAP standards.So it will be helpful to our study of pipeline assessment.
出处 《焊管》 2003年第2期11-15,61,共5页 Welded Pipe and Tube
关键词 天然气管线 评定标准 结构 完整性 焊接缺陷 管道焊接 natural gas pipelines assessment standards structure integrity
  • 相关文献

参考文献8

  • 1[1]Budden P J,Sharples J K,Dowling A R.The R6 procedure: recent developments and comparison with alterative approaches. International Journal of Pressure Vessels and Piping.2000,77:895~903
  • 2[3]API.Recommended practice for fitness-for service.API 579.Washington,DC:American Petroleum Institute,2000
  • 3[4]Ainsworth R A,Sharples J K,Smith S D.Effects of residual stress on fracture behavior D experimental results and assessment methods.J Strain Anal.2000.53
  • 4[5]Ted L.Anderson,David A.Osaga.API 579:a comprehensive fitness-for-service guide.International Journal of Pressure Vessels and Piping.2000,77:953
  • 5[6]Ainsworth R A,Bannister A C,Zerbst U.An overview of the European flaw assessment procedure SINTAP and its validation.International Journal of Pressure Vessels and Piping.2000,77:869
  • 6[7]British Standards Institution.BS 7910-1999:(incorporating Amendment No.1) Guide on methods for assessing the acceptability of flaws in metallic structures.London,2000
  • 7[8]Wiesner C S,Maddox S L,Xu w,et al.Engineering critical analyses to BS 7910-the UK guide on methods for assessing the acceptability of flaws in metallic structures.International Journal of Pressure Vessels and Piping,2000,77:883~893
  • 8[9]BRITE EURAM Project. Structural Integrity Assessment Procedure for European Industry-SINTAP,Procedure Document,Rotherham,UK:British Steel (now Corus Group) Swinden Technology Centre.1999

同被引文献36

  • 1魏悦广,王自强.扩展裂纹尖端弹塑性场[J].力学学报,1994,26(1):38-48. 被引量:3
  • 2马维甸 张式程 等.低匹配焊接接头不均匀裂纹体的J积分研究[J].焊接学报,1987,8(2):89-96.
  • 3马维甸 田锡唐.焊接接头软夹硬不均匀裂纹体的J积分研究[J].焊接学报,1986,7(1):23-30.
  • 4英国中央电力局.有缺陷结构完整性的评定标准R/H/R6.3版[Z].华东化工学院化工机械研究所,1988..
  • 5GB50316-2000.工业管道设计规范.[S].,..
  • 6国家质量监督检验检疫总局.在用工业管道定期检验规程(试行)[Z].,2003..
  • 7Budden P J, Sharples J K, Dowling A R. The R6 Procedure: Recent Developments and Comparison with Alterative Approaches. International Journal of Pressure Vessels and Piping, 2000, 77(12) : 895~903.
  • 8Ainsworth R A, Bannister A C, Zerbst U. An Overview of the European Flaw Assessment Procedure SINTAP and Its Validation. International Journal of Pressure Vessels and Piping, 2000, 77(12): 869~876.
  • 9BS7910-1999 Guide on Methods for Assessing the Acceptability of Flaws in Metallic Structures.British Standards Institution,2000.
  • 10Kim Y J,Schwalbe K H,Ainsworth R A. Simplified J- Estimations Based on Engineering Treatment Model for Homogeneous and Mismatched Structures. Engineering Fracture Mechanics, 2001, 68(1) : 9~27.

引证文献7

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部