摘要
结合工程实例 ,讨论了供水管线并网施工中需要注意的几个问题及应采取的措施 ,阐述了施工中最大限度地压缩停水时间 ,减缩停水范围的方法 。
In combination with the case project ,this paper presents discussion about several problems and measures which should be taken that it’s necessary to be paid attention to during network combination construction of water supply pipe line.This paper also presents a way to shorten water pause time and reduce its range possibly,and sums that the principle should be followed in net combination construction.
出处
《黑龙江水专学报》
2000年第3期78-79,共2页
Journal of Heilongjiang Hydraulic Engineering College
关键词
供水管网
并网
施工
停水时间
城市
water supplying pipe network
network combination construction
water pause time
principle