3VILCOT G,BILLAUT J C.A tabu search and a genetic algorithm for solving a bicriteria general job shop scheduling problem[J].European Journal of Operational Research,2008,190(2):398-411.
4GAO Jie,SUN Lin-yan,GENB M.A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems[J].Computers & Operations Research,2008,35(9):2892-2907.
5BALAS E,LENSTRA J K,VAZACOPOULOS A.The one-machine problem with delayed precedence constraints and its use in job shop scheduling[J].Management Science,1995,41(1):94-109.
6McCORMICK S T,PINEDO M L.Scheduling n independent job on uniform machines with both flow time and makespan objectives:a parametric analysis[J].Journal of Computing,1995(7):63-77.
7ELKAMEL A,MOHINDRA A.A rolling horizon heuristic for reactive scheduling of batch process operation[J].Engineering Optimization,1999,31(6):763-792.
8LIU Min,HAO Jing-hua,WU Cheng.A prediction based iterative decomposition algorithm for scheduling large-scale job shops[J].Mathematical and Computer Modeling,2008,47(3-4):411-421.
9KELLY J D,ZYNGIER D.Hierarchical decomposition heuristic for scheduling:coordinated reasoning for decentralized and distributed decision-making problems[J].Computers and Chemical Enginee-ring,2008,32(11):2684-2705.
10SZWARC W.Decomposition in single machine scheduling[J].Annals of Operations Research,1998,83(1):271-287.