4Turgut Yalcin. Rapid dewatering of mill tailings. In Proceedings of the 19th Annual Meeting of the Canadian Mineral Processors, Ottawa, 1987.
5Turgut Yalcin. An Improved dewatering process for mill taihngs. CIM Bulletin, 1989,82 ( 924 ):48 - 54.
6Brackebusch F, Shillabeer J. Use of Paste for Tailings Disposal.Minefill'98, Brisbane, 1998.
7Williams M P A,Ennis P C. Suitability of the central thickened discharge method for nickel tailings disposal in Western Australia. Proceedings of the 1996 Nickel Conference, Kalgoorlie, Australia, 1996.
8Nguyen Q D, Boger D V. Application of technology to solving tailings disposal problems. International Journal of Mineral Processing, 1998,54(3-4):217 - 233.
9Robinsky E I. Tailings dam failures need not be disasters-the Thickened Tailings Disposal ( TYD ) system. CIM Bulletin, 1999,92(1 028) :140-142.
10Cincilla W A, et al. Geotechnical factors affecting the surface placement of process tailings in paste form. Australasian Institute of Mining and Metallurgy Publication, 1998 ( 1 ) :337 - 340.