3MESA. MES explained : a high level vision [ M ]. Pittsburgh : MESA International White Paper Number 6, 1997.
4Michael M C. Applying manufacturing execution systems [ M]. Boca Raton, Florida: St Lucie Press, 1997.
5Yeong D H. The practices of integrating manufacturing execution system and six sigma methodology [ J ]. International Journal of Advanced Manufacturing Technology, 2006 (30) : 761-768.
6Arturo M, Armando R S. Achieving e-manufacturing: multihead control and web technology for the implementation of a manufacturing execution system [ J ]. Journal of Intelligent Manufacturing, 2006, 17(6) : 715-724.
7[5]Tang L X,Liu J Y,Rong A Y,et al.Modeling and a genetic algorithm solution for the slab stack shuffling problem when implementing steel rolling schedules[J].International Journal of Production Research,2002,40(5):1583-1595.
8[6]Tang L X,Luh P B,Liu J Y,et al.Steel-making process scheduling using Lagrangian Relaxation[J].International Journal of Production Research,2002,40(1):55-70.
9[7]Tang L X,Liu J Y,Rong A Y,et al.A review of planning and scheduling systems and methods for integrated steel production[J].European Journal of Operational Research (Invited Review),2001,133(1):1-20.
10[8]Tang L X,Liu J Y,Rong A Y,et al.A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex[J].European Journal of Operational Research,2000,124 (2):267-282.