随着高层建筑的迅猛发展,为营造大空间的视觉效果,高支模工程得到广泛运用。但建筑工程高支模属于危险性较大工程,近年来新闻媒体屡次报道全国各地有因高支模支撑体系失稳造成坍塌、引起一系列的质量安全事故。笔者根据几年来从事学院基建工程施工管理的经验,并结合我院图文信息中心大楼工程高支模施工管理取得的成效,谈谈高支模施工过程中的控制措施和技术要点。
With the rapid development of high-rise buildings, to create the space visual effect, high formwork engineering has been widely used. But the construction of high formwork belongs to high risk project. In recent years, the news media repeat-edly reported throughout the country because of high formwork support system instability caused by collapse, causing a series of quality and safety accidents. The author according to several years in college capital construction project construction man-agement experience, combined with our hospital graphic information center building high formwork construction management achievements, talk about the construction of high formwork process control measures and technical points.
出处
《科教导刊》
2016年第5Z期145-146,共2页
The Guide Of Science & Education
关键词
高支模支撑体系
专家论证
阶段性验收
预控措施
high formwork support system
expert argumentation
phased acceptance
preventive measures